Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, sitework with onsite utility services: FOR THE INSTALLATION OF UNDERGROUND UTILITIES AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLAN. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. ** SEPERATE PERMITS REQUIRED BY THE STREETS DEPARTMENT FOR ALL WORK IN THE PUBLIC RIGHT OF WAY. **THIS SITE PERMIT FOR ELECTRICAL SYSTEM INSTALLATION ONLY** · 1 permit