The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: marquis henderson, under CP-2025-001492 · o Installation of 100amp NEMA 3R subpanel in exterior wall of penthouse on rooftop o GFCI receptacles o strip fixtures in staircase controlled by occupancy sensors o recessed lights in enclosed skylight area o exit signs receptacles and lights only installed on rooftop exterior · 1 permit
Aug 18, 2026
Other trade
Commercial addition: LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) WITH ROOF DECK ADDITION TO AN EXISTING BUILDING FOR USE AS EXISTING PERSONAL SERVICES & BUSINESS/PROFESSIONAL OFFICE AS PER APPROVED PLANS. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK** · 1 permit