Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: Site / Utility Permit for CP-2026-001029 · 1 permit
May 29, 2026
Fire protection & life safety
Fire suppression permit: Aqueduct Fire Protection Systems, LLC, under CP-2026-001029 · INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 WITH A FIRE DEPARTMENT CONNECTION, BACKKFLOW PREVENTION DEVICE AND 2" SERVICE LINE, THROUGHOUT A THREE (3) STORY STRUCTURE. SEPARATE PERMIT REQUIRE FOR ALL PLUMBING WORK · 2 permits
May 1, 2026 to Aug 25, 2026
Plumbing
Plumbing permit: David R Smith, under CP-2026-001029 · - Exterior Storm and Sanitary Plumbing for New Construction in accordance with EZ Permit Standard for Plumbing. - Exterior 1" Water Distribution for New Construction in accordance with EZ Permit Standard for Plumbing. · 2 permits
May 1, 2026 to Oct 19, 2026
Electrical
Electrical permit: REDLINE ELECTRIC, under CP-2026-001029 · Installation of the new 400 amp electrical service, fire alarm and new wiring throughout lights, outlets and smoke alarms as per APPROVED DRAWINGS-2017 NEC . · 2 permits