Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: DAVIS S OWENS GROUP, under CP-2025-006146 · Add new fire alarm devices to existing system located on the first floor as per 2016 NFPA 72. · 3 permits
Dec 10, 2025 to Apr 6, 2026
Plumbing
Plumbing permit: LIMA COMPANY, under CP-2025-006146 · Rough in and install new floor sink and kitchen sink. · 2 permits
Dec 10, 2025 to Jan 28, 2026
Fire protection & life safety
Fire suppression permit: A & S SPRINKLER CO INC, under CP-2025-006146 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (46) EXISTING SPRINKLER HEADS PER NFPA 13 · 2 permits