Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, sitework with onsite utility services: FOR THE INSTALLATION OF UNDERGROUND UTILITIES AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *See Flood Protection Form- Project Summary (FP-PS)" Dated 6-502025 for Floodplain Requirements. · 1 permit
Feb 25, 2026
Plumbing
Plumbing permit: A. T. CHADWICK COMPANY INC, under CP-2025-003732 · EXTENSION OF ADDITIONAL WORK INTO NEW CONSTRUCTION BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE BASE VENTING CODE. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2021 PPC AND APPROVED PLANS · 2 permits
Mar 27, 2026 to Oct 15, 2026
HVAC
Mechanical permit: A. T. CHADWICK COMPANY INC, under CP-2025-003732 · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. · 2 permits
Apr 15, 2026 to Sep 23, 2026
Fire protection & life safety
Fire suppression permit: S A COMUNALE CO INC, under CP-2025-003732 · TO INSTALL NEW FIRE SUPPRESSION SYSTEM PROVIDED ON GROUND FLOOR BELOW CENTER MEZZANINE 1, ABOVE CENTER MEZZANINE 1 AND MEZZANINE 2, AND TO GROUND FLOOR BUSINESS OCCUPANCY (SEPARATE FIRE SUPPRESSION PERMIT TO BE SUBMITTED FOR FIRE SPRINKLERS ON LEVEL 2 AND 3 OF THE OFFICE SPACE) COMPLYING WITH NFPA 13 TO INCLUDE 8" MAIN FIRE SERVICE LINE WITH 8" AMES COLT 400 BACKFLOW PREVENTION ASSEMBLY WITH A FIRE PUMP IN ACCORDANCE WITH NFPA · 3 permits
Jul 1, 2026 to Oct 13, 2026
Other trade
Commercial tenant fit-out: FOR FITOUT OF 2ND AND 3RD FLOORS AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC* · 1 permit