The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work permit: R&D Realty LLC, under RP-2026-001148 · Site / Utility Permit for RP-2026-001148 · 2 permits
Apr 2, 2026 to Apr 15, 2026
Electrical
Electrical permit: City Lights electric llc, under RP-2026-001148 · Electrical Permit for combo RP-2026-001148 · 2 permits
Apr 2, 2026 to Aug 25, 2026
HVAC
Mechanical permit: Oris-Hvac Inc, under RP-2026-001148 · Mechanical / Fuel Gas Permit for combo RP-2026-001148 · 2 permits
Apr 2, 2026 to Aug 21, 2026
Plumbing
Plumbing permit: THOMAS UHL, under RP-2026-001148 · Plumbing Permit (Water Distribution) for combo RP-2026-001148 · 4 permits
Apr 2, 2026 to May 21, 2026
Fire protection & life safety
Fire suppression permit: DC MECHANICAL II LLC, under RP-2026-001148 · INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · 2 permits
Apr 2, 2026 to Aug 20, 2026
Other trade
Residential new construction: FOR NEW CONSTRUCTION OF A THREE-STORY ATTACHED BUILDING WITH BASEMENT. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION. · 1 permit
Apr 2, 2026
Other trade
Residential new construction: FOR NEW CONSTRUCTION OF A THREE-STORY ATTACHED BUILDING WITH BASEMENT. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION. · 1 permit
Apr 2, 2026
Other trade
Residential new construction: FOR NEW CONSTRUCTION OF A THREE-STORY ATTACHED BUILDING WITH BASEMENT. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION. · 1 permit