The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Plumbing
Plumbing permit: FERKO PLUMBING & HEATING CO INC, under RP-2026-007910 · Plumbing Permit (Water Distribution) for combo RP-2026-007910 · 3 permits
Aug 23, 2026 to Oct 8, 2026
Plumbing
Plumbing permit: STEPHEN GILKIN, under RP-2026-007910 · Plumbing Permit (Interior) for combo RP-2026-007910 · 2 permits
Aug 23, 2026 to Sep 25, 2026
Fire protection & life safety
Fire suppression permit: Aqueduct Fire Protection Systems, LLC, under RP-2026-007910 · INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · 2 permits
Aug 23, 2026 to Sep 29, 2026
Electrical
Electrical permit: ANTHONY L DAVIS JR, under RP-2026-007910 · Electrical Permit for combo RP-2026-007910 · 2 permits