The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Fire protection & life safety
Fire suppression permit: ONEIDA FIRE PROTECTION INC, under RP-2025-011600 · FOR THE INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D THROUGHOUT TWO-STORY BUILDING TO INCLUDE 1-INCH COMBINED WATER SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · 2 permits
Dec 23, 2025 to Mar 10, 2026
Plumbing
Plumbing permit: FERKO PLUMBING & HEATING CO INC, under RP-2025-011600 · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-011600 · 4 permits
Dec 23, 2025 to Feb 11, 2026
Electrical
Electrical permit: EAGLE ELECTRICAL CONSTRUCTION CO INC, under RP-2025-011600 · Electrical Permit for combo RP-2025-011600 · 2 permits
Dec 23, 2025 to Feb 24, 2026
HVAC
Mechanical permit: Airzonehvac inc, under RP-2025-011600 · Mechanical / Fuel Gas Permit for combo RP-2025-011600 · 2 permits