The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: Site / Utility Permit for CP-2026-003676 · 1 permit
Aug 3, 2026
Other trade
Multifamily new construction: NEW CONSTRUCTION OF A THREE-STORY BUILDING WITH CELLAR AND PRIVATE ROOF DECK/PILOT HOUSE FOR USE A THREE (3) DWELLING UNITS AS PER APPROVED PLANS. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** · 1 permit
Jul 24, 2026
Other trade
Multifamily new construction: NEW CONSTRUCTION OF A THREE-STORY BUILDING WITH CELLAR AND PRIVATE ROOF DECK/PILOT HOUSE FOR USE A THREE (3) DWELLING UNITS AS PER APPROVED PLANS. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK** · 1 permit