The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Other trade
Multifamily new construction: FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS FOUR (4) DWELLING UNITS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 MINIMUM. **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.** **2018 IBC***NO EXCAVATION GREATER THAN 5FT.* · 1 permit
Apr 30, 2026
Other trade
Multifamily new construction: FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS FOUR (4) DWELLING UNITS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 MINIMUM. **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.** **2018 IBC***NO EXCAVATION GREATER THAN 5FT.* · 1 permit