The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Plumbing
Plumbing permit: ZURAB ODIKADZE, under CP-2025-003352 · ALTERATIONS TO EXISTING TRIPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS · 2 permits
Dec 19, 2025 to Feb 4, 2026
HVAC
Mechanical permit: Bedri Allaraj, under CP-2025-003352 · INSTALLATION OF HVAC SYSTEM FOR A THREE-FAMILY DWELLING IN AN EXISTING BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW* · 2 permits
Dec 19, 2025 to Sep 15, 2026
Fire protection & life safety
Fire suppression permit: ONEIDA FIRE PROTECTION INC, under CP-2025-003352 · FOR THE INSTALLATION OF FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2-INCH WILKINS 950XLT2 BACKFLOW PREVENTER AND AUTOMATIC FIRE SUPPRESSION SYSTEM. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · 2 permits