Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work permit: MV Homes, Inc, under RP-2025-013398 · Site / Utility Permit for RP-2025-013398 · 1 permit
Mar 4, 2026
Electrical
Electrical permit: EAGLE ELECTRICAL CONSTRUCTION CO INC, under RP-2025-013398 · Electrical Permit for combo RP-2025-013398 · 2 permits
Mar 2, 2026 to Jun 29, 2026
Plumbing
Plumbing permit: THOMAS UHL, under RP-2025-013398 · Plumbing Permit (Water Distribution) for combo RP-2025-013398 · 4 permits
Mar 2, 2026 to May 6, 2026
Fire protection & life safety
Fire suppression permit: METROPOLITAN FIRE PROTECTION, under RP-2025-013398 · FOR THE INSTALLATION OF A 2-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH A 2 INCH WILKINS 950XLT2BFSS BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WITH NFPA 13R. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. · 2 permits
Mar 2, 2026 to Apr 15, 2026
HVAC
Mechanical permit: BILT Modern LLC, under RP-2025-013398 · Mechanical / Fuel Gas Permit for combo RP-2025-013398 · 1 permit
Jul 16, 2026
Other trade
Residential new construction: FOR NEW CONSTRUCTION OF AN ATTACHED FOUR-STORY BUILDING WITH CELLAR AND ROOF DECKS (ACCESSED VIA WALL OPENING AND EXTERIOR STAIRWAY). BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13R THROUGHOUT. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK. *SHARED TUNNEL ALLEY IS REQUIRED TO BE RECORDED ON DEED PRIOR TO C.O. ISSUANCE* **AMEND 6/17/26; ADD CANOPY/ROOF COVERING AT FRONT ENTRYWAY PER AMENDED CONSTRUCTION DOCUMENTS* · 1 permit