The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Plumbing
Plumbing permit: FERKO PLUMBING & HEATING CO INC, under RP-2025-011703 · - Exterior Storm and Sanitary Plumbing for Residential New Construction in accordance with EZ Permit Standard for Plumbing - Exterior Water Distribution for Residential New Construction in accordance with EZ Permit Standard for Plumbing - Interior Plumbing System for Residential New Construction in accordance with EZ Permit Standard for Plumbing · 36 permits
Nov 12, 2025 to Oct 29, 2026
HVAC
Mechanical permit: Sanks Mechanical, under RP-2025-008063 · Mechanical / Fuel Gas Permit for combo RP-2025-008063 · 32 permits
Nov 12, 2025 to Jul 29, 2026
Other trade
Residential new construction: FOR THE ERECTION OF AN ATTACHED 3-STORY STRUCTURE WITH AN OCCUPIABLE ROOF DECK ACCESSED FROM THE THIRD FLOOR (REAR). STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. THE BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHI · 2 permits