Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: Madden Electric Associates, Inc, under CP-2025-005876 · ELECTRICAL WORK FOR NEW COUNTERTOPS AND NEW CEILINGS INCLUDING LIGHTS, AND RECEPTACLES, NO FIRE ALARM. EXISTING PANEL TO BE USED · 2 permits
Dec 23, 2025 to Jan 28, 2026
Plumbing
Plumbing permit: NAGEL LAVIN INC, under CP-2025-005876 · To relocate 2 existing sinks, including new water & drain lines. · 2 permits
Dec 23, 2025 to Jan 13, 2026
HVAC
Mechanical permit: DWD MECHANICAL CONTRACTOR INC, under CP-2026-005420 · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocating 15 diffusers/registers ONLY. · 2 permits
Oct 5, 2026 to Oct 27, 2026
Other trade
Commercial alteration: FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, NEW FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 1 permit
Oct 5, 2026
Other trade
Commercial alteration: FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, NEW FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 1 permit
Oct 5, 2026
Other trade
Commercial alteration: FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, NEW FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 1 permit
Oct 5, 2026
Other trade
Commercial alteration: FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, NEW FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 1 permit
Oct 5, 2026
Other trade
Commercial alteration: FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, NEW FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 1 permit