Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work permit: GROSSO CONCRETE LLC, under RP-2025-010886 · Site / Utility Permit for RP-2025-010886 FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION OF A THREE (3) STORY SINGLE-FAMILY DWELLING AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. **2018 IRC REVIEW** · 2 permits
Jan 21, 2026 to Mar 5, 2026
Fire protection & life safety
Fire suppression permit: ONEIDA FIRE PROTECTION INC, under RP-2025-010886 · THE INSTALLATION OF A ONE (1) INCH COMBINED SERVICE LINE FOR A FIRE & DOMESTIC SUPPLY LINE, FIRE PUMP AND FIRE SERVICE LINE WITH REMOTE TOILET CONNECTION PER PLANS. MULTIPURPOSE RESIDENTIAL FIRE SPRINKLER SYSTEM DESIGNED IN ACCORDANCE WITH NFPA 13D. ALL WORK SHALL BE ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS, AND APPROVED BUILDING PERMIT. SEPARATE PERMITS REQUIRED FOR ALL PLUMBING WORK. · 2 permits
Jan 21, 2026 to Jun 25, 2026
Electrical
Electrical permit: Baldwin Electrical Construction LLc, under RP-2025-010886 · Electrical Permit for combo RP-2025-010886 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction plans. · 2 permits
Jan 21, 2026 to Mar 4, 2026
Plumbing
Plumbing permit: FERKO PLUMBING & HEATING CO INC, under RP-2025-010886 · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-010886 · 4 permits
Jan 21, 2026 to Mar 2, 2026
HVAC
Mechanical permit: AL-KAUN CO, under RP-2025-010886 · Mechanical / Fuel Gas Permit for combo RP-2025-010886 EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and/or Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction plans. · 2 permits