The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: Site / Utility Permit for CP-2026-001714 · 1 permit
May 29, 2026
Fire protection & life safety
Fire suppression permit: Aqueduct Fire Protection Systems, LLC, under CP-2026-001714 · FOR INSTALLATION OF TWO-INCH FIRE SERVICE LINE, TWO-INCH BACKFLOW PREVENTER AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13. · 2 permits
May 1, 2026 to Aug 27, 2026
Electrical
Electrical permit: REDLINE ELECTRIC, under CP-2026-001714 · Installation of the new 400 amp electrical service and wiring wiring throughout lights, outlets and smoke alarms as per 2017 NEC. Install fire alarm system as per 2016 NFPA 72. · 2 permits
May 1, 2026 to Oct 19, 2026
Plumbing
Plumbing permit: David R Smith, under CP-2026-001714 · - Exterior Storm and Sanitary Plumbing for New Construction in accordance with EZ Permit Standard for Plumbing. - Exterior 1" Water Distribution for New Construction in accordance with EZ Permit Standard for Plumbing. · 2 permits