Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: DC Power Associates, LLC, under CP-2025-006155 · Interior renovation existing vacant commercial space to a daycare, new lighting, outlets (all receptacles to be tamper resistant note 1 sheet e-100) New transformer Fed from R3 panel, and fire alarm devices. All work Per approved plans. NEC 2017 All work per approved plans. · 2 permits
Feb 3, 2026 to Apr 7, 2026
HVAC
Mechanical permit: T-B Contractor Co, under CP-2025-006155 · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, BATHROOM EXHAUSTS, AND ASSOCIATED DUCTWORK THROUGHOUT A DAY CARE AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-006155 FOR ASSOCIATED BUILDING PERMIT. · 2 permits
Feb 3, 2026 to Apr 6, 2026
HVAC
Mechanical permit: EAST COAST BUSINESS FIRE INC, under CP-2025-006155 · FOR THE INSTALLATION OF ONE (1) 8'-0" TYPE I HOOD WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · 2 permits
Feb 3, 2026 to Jun 8, 2026
Fire protection & life safety
Fire suppression permit: Aqueduct Fire Protection Systems, LLC, under CP-2025-006155 · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 118 SPRINKLER HEADS TO ACCOMODATE THE NEW FLOOR PLANS · 2 permits
Feb 3, 2026 to Mar 10, 2026
Plumbing
Plumbing permit: JUST PLUMBING & HEATING INC, under CP-2025-006155 · Project Scope Description New classroom and support spaces will be fit out on the 1st floor of the existing mixed-use building. The existing space is fully sprinklered. New sprinkler head locations will be added as required. No new work will occur outside of the existing building envelope. Plumbing Scope Classroom sink Mop sink Three-compartment sink Hand sink Grease trap interceptor Floor sink Floor drain Water fountain · 2 permits
Feb 3, 2026 to Apr 6, 2026
Fire protection & life safety
Fire suppression permit: EAST COAST BUSINESS FIRE INC, under CP-2025-006155 · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Kitchen suppression system · 1 permit