The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Electrical permit: EAST COAST ELECTRICAL SERVICES INC, under CP-2026-000927 · Interior wiring for a cafe, all work per approved plans. ***NO FIRE ALARM ON THIS PERMIT*** · 2 permits
Mar 16, 2026 to Jun 17, 2026
Plumbing
Plumbing permit: ZURAB ODIKADZE, under CP-2026-000927 · AMENDMENT 6/23/2026 Utilizing the existing domestic water service instead of installing a new water service. Relocating the grease interceptor to the garage area behind the kitchen wall. Connecting the new drain vent piping to the existing 4" vent located in the garage instead of installing a new vent run through to roof. Utilizing the existing condensate drain piping for the HVAC condensate pumps instead of installing new condensate drain · 2 permits