The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, excavation: UNDERPINNING AND EXCAVATION WORK ASSOCIATED WITH A PROPOSED BUILDING ADDITION (SEE PERMIT CP-2026-002261) AS PER APPROVED PLANS. UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. *2018 IBC REVIEW* AMENDMENT APPROVE 7/27/26 AMEND EXCAVATION PERMIT SP-2026-000609 TO INCLUDE ADDITIONAL UNDERPINNING WORK AS PER APPROVED PLANS. · 1 permit