Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Site work
Site work, stormwater: INSTALLATION OF SUBSURFACE DRY EXTENDED DETENTION WITH SLOW RELEASE AND VEGETATED SWALES. · 1 permit
Apr 23, 2026
Electrical
Electrical permit: Arrow Electric LLC, under BDA-2024-02179 · ELECTRICAL SYSTEM FOR FIVE STORY RESIDENTIAL APARTMENT BUILDING WITH SWIMMING POOL AND COURTYARDS ON LEVEL 1 · 1 permit
Nov 13, 2025
HVAC
Mechanical permit: Elk Air Conditioning Inc, under BDA-2024-02179 · MECHANCIAL SYSTEM FOR NEW FIVE STORY RESIDENTIAL APARTMENT PODIUM BUILDING WITH 1 COURTYARD WITH POOL AND 1 COURTYARD AND AMENITY SPACE (TYPE I HOOD NOT PART OF WORKSCOPE) · 1 permit
Nov 19, 2025
Electrical
Electrical permit: Pennhab Consulting LLC, under BDA-2024-02179 · 1 permit
Dec 3, 2025
Fire protection & life safety
Fire protection permit: Ryco Fire Protection Services LLC, under BDA-2024-02179 · NEW DRY SPRINKLER SYSTEM BELOW PODIM, WET SYSTEM ABOVE AND STANDPIPES IN NEW BUILDING · 2 permits
May 1, 2026 to Jun 29, 2026
Electrical
Electrical permit: TSB Inc, under BDA-2026-05277 · INSTALLATION OF ELECTRICAL VEHICLE CHARGING STATIONS IN PARKING GARAGE · 1 permit
Jul 23, 2026
Fire protection & life safety
Fire protection permit: Arrow Electric LLC, under BDA-2026-05277 · INSTALL NEW AUTOMATIC AND MANUAL FIRE ALARM SYTEM IN NEW BUILDING · 1 permit