The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
HVAC
Mechanical permit: Gunning Mechanical Contractors, under BDA-2025-11215 · ALTERATION TO THE EXISTING MECHANICAL SYSTEM IN RELATION TO BDA-2025-11215. WORK INCLUDES NEW INTERIOR AND EXTERIOR EQUIPMENT, DUCTWORK AND EXHAUST SYSTEM. · 2 permits
Mar 26, 2026 to Jul 1, 2026
Fire protection & life safety
Fire protection permit: Total Fire Protection, LLC, under BDA-2025-11215 · ALTERATION TO THE EXISTING WATERBASED WET SUPPRESSION SYSTEM IN RELATION TO BDA-2025-11215. WORK INCLUDES NEW SPRINKLERHEADS AND PIPING. · 2 permits
Mar 26, 2026 to Aug 7, 2026
Fire protection & life safety
Fire protection permit: Miller Electric Construction, Inc, under BDA-2025-11215 · ALTERATION TO THE EXISTING MANUAL FIRE ALARM SYSTEM IN RELATION TO BDA-2025-11215. WORK INCLUDES NEW INITIATING AND NOTIFICATION DEVICES AND CIRCUITS. · 2 permits
Mar 26, 2026 to Jun 1, 2026
Electrical
Electrical permit: Miller Electric Construction, Inc, under BDA-2025-11215 · ALTERATION TO THE EXISTING ELECTRICAL SYSTEM IN RELATION TO BDA-2025-11215. WORK INCLUDE NEW PANELS, CIRCUITS, LIGHTING, AND LOW VOLTAGE SYSTEM. · 1 permit