The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Fire protection & life safety
Fire protection permit: Alliance Fire Systems Inc, under BDA-2025-09925 · 2 permits
Oct 28, 2025 to Jan 7, 2026
HVAC
Mechanical permit: Environmental Air, Inc, under BDA-2025-09925 · 2 permits
Oct 28, 2025 to Dec 2, 2025
Fire protection & life safety
Fire protection permit: M & J Electrical Contracting, Inc, under BDA-2025-04017 · 1 permit
Oct 28, 2025
Electrical
Electrical permit: M & J Electrical Contracting, Inc, under BDA-2025-09925 · 2 permits
Oct 28, 2025 to Dec 2, 2025
Electrical
Electrical permit: Kirby Electric Inc, under BDA-2025-04017 · STANDALONE PERMIT FOR ALTERATIONS TO ELECTRICAL SYSTEM, INCLUDING INSTALLING BRANCH CIRCUITS AND POWER POLE WIREWAYS FOR OFFICE FURNISHINGS. · 1 permit
Nov 18, 2025
Electrical
Electrical permit: Wolfpack Electric LLC, under BDA-2026-06214 · INTERIOR ALTERATIONS TO ELECTRICAL SYSTEMS, LIGHTING & CONTROLS FOR ALTERATIONS TO EXISTING TENANT SPACE · 1 permit