MON, NOV 9Filings 7d232Permits 7d117Deeds & loans 7d9Starts 7d0Updates 7d661Building160Contacts6,356
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.