SUN, NOV 8Filings 7d213Permits 7d108Deeds & loans 7d4Starts 7d0Updates 7d630Building159Contacts6,350
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.