SUN, NOV 8Filings 7d213Permits 7d108Deeds & loans 7d4Starts 7d0Updates 7d630Building159Contacts6,350
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually right before the first pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.