TUE, NOV 17Filings 7d832Permits 7d78Deeds & loans 7d2Starts 7d1Updates 7d284Building582Contacts7,084
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually right before the first pour.