WED, NOV 11Filings 7d187Permits 7d68Deeds & loans 7d4Starts 7d1Updates 7d734Building165Contacts6,406
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.