TUE, NOV 17Filings 7d832Permits 7d78Deeds & loans 7d2Starts 7d1Updates 7d284Building582Contacts7,084
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.