The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Electrical
Commercial Remodel Permit: UTI San Antonio - Phase 2. THE SCOPE OF THIS "PHASE 2" PROJECT IS TO PROVIDE AN EXTERIOR SOUND ENCLOSURE AND FENCING ENCLOSURE FOR UTI'S EQUIPMENT NEEDS. WORK SHALL INCLUDE ALL NECESSARY STRUCTURAL AND ELECTRICAL, AS REQUIRED. SOUND-ABSORPTIVE WALL STRUCTURE/DESIGN PROVIDED BY SOUND FIGHTER. NOTE PHASE 1, INTERIOR SCOPE WAS PREVIOUSLY APPROVED UNDER PERMIT COM-PRJ-APP25-39801029 · 1 permit