The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
HVAC
Commercial Remodel Permit: UH - Machine Room 1 HVAC Upgrades. Install Barrier between Electrical Equipment and Mechanical Equipment on the Basement level of the Rio Tower. Provide air conditioning to Electrical Equipment.,,, · 1 permit
Mar 23, 2026
HVAC
Commercial Remodel Permit: University Health Pathology RENOV. Renovation of 11,000 sq ft of new non-patient care space planned to be used primarily as a lab with some offices. 2024 I-Codes ,,, · 1 permit
Apr 8, 2026
Electrical
Commercial Finish Out Permit: SKY TOWER IMRI/OR FINISH OUT. Project scope includes the interior finish out of a shell space inside University Health Level 02 into an Operating Room and an Intraoperative MRI room/ Operating Room. Work will comply with THHS requirements, will include temporarily removing existing exterior window for equipment access and add a new chiller to the roof on Level 04.,,, · 1 permit
Apr 14, 2026
Electrical
Commercial Remodel Permit: 5th Floor Horizon Tower Command Center Demolition. Shall Comply with 2024 IBC Demolition of interior suite for future office space/business occupancy · 1 permit