- Status
- Under Construction
- Use
- Industrial
- Floors
- 1
- Square Footage
- 538,720
- Parking
- 138
- Construction Start
- Dec 6, 2026
- Expected Completion
- Dec 3, 2028
- Lot Size
- 27.7 ac
- Data as of
- Sep 28, 2026
36-foot clear-height ceilings65-foot loading bays55-by-52-foot interior column spacing105 dock doorsfour drive-in overhead doorstwo 130-foot truck courts138 trailer parking spacesEarly Suppression Fast Response (ESFR) sprinkler systemcross-dock configuration