I-35 Redesign / Drainage Tunnel Package (Holly Street to Airport Boulevard segment)
Under Constructionπ I-35 from Holly St to Airport Blvd, including Cesar Chavez corridor, Austin, TXInfrastructureTracked since Feb 5, 2026
Units
β
Floors
β
Height
β
Sq Ft
β
Groundbreak Pro
The full project file β complete specifications, permit records, field-by-field change history, and the project team β is part of Groundbreak Pro, along with the live pipeline map, saved-search alerts, and CSV export.
Go Pro β $19/month