Fire protection work coming up in Manitoba
23 projects in Manitoba fit sprinkler and fire alarm suppliers and fire protection contractors in the last 30 days. Each has a building permit, a construction start, a sub hired on a trade permit or a site plan on the public record, at $1M and up, houses left out, in the phases where fire protection gets bought.
Projects that fit, from the last 30 days
A few of the 23, biggest first. Each opens its project file. Pro names the people on each one.
- 409 Tache AveA sub just pulled the fire protection & life safety permit · they buy the materialSubs hired · Approved
- 1820 De Vries AveA sub just pulled the fire protection & life safety permit · they buy the materialSubs hired · Approved
- 331 Smith StRenovation of a multifamilyPermit · Approved
- 600 Gertrude AveNew multifamilyPermit · Approved
- 578 Provencher BlvdNew industrial buildingPermit · Approved
- 360 Black Diamond BlvdNew industrial buildingPermit · Approved
- 1485 Portage AveA sub just pulled the fire protection & life safety permit · they buy the materialSubs hired · Approved
- 500 Camiel Sys StA sub just pulled the fire protection & life safety permit · they buy the materialSubs hired · Approved
When fire protection gets bought
Sprinkler and alarm design starts early, and the rough-in follows the structure floor by floor.
On 133 Miami jobs we measured, the fire protection permit landed a median 103 days after the first building permit, and three in four had it by day 490.
New building permits and construction starts for anything big enough to need sprinklers.
In ChatGPT or Claude
With Pro, ask your AI assistant for fire protection jobs in Manitoba and it reads Groundbreak for you, names included. It works in Claude, ChatGPT, Cursor and any app that takes an MCP server.
Set it up in a minute ↗Questions
- How do sprinkler and fire alarm suppliers and fire protection contractors find new projects in Manitoba?
- Watch the public record, not the bid boards. New building permits and construction starts for anything big enough to need sprinklers. 23 projects in Manitoba fit sprinkler and fire alarm suppliers and fire protection contractors in the last 30 days. Each has a building permit, a construction start, a sub hired on a trade permit or a site plan on the public record, at $1M and up, houses left out, in the phases where fire protection gets bought. Radar sends the next one the day it files.
- When does a GC buy fire protection on a job?
- Sprinkler and alarm design starts early, and the rough-in follows the structure floor by floor. On 133 Miami jobs we measured, the fire protection permit landed a median 103 days after the first building permit, and three in four had it by day 490.
- How do I find out which sub won the job in Manitoba?
- Manitoba publishes trade permits, and each one names the sub who pulled it. Radar shows them the day they file, so you can call the sub who now buys the fire protection.
- Where does this count come from?
- Groundbreak reads permits in Winnipeg and subs on trade permits in Winnipeg in Manitoba every day and groups them into projects. This page counts the projects at the stages a supplier watches, the same count sign-up shows for the same picks. It was computed Nov 11, 2026, 3:17 AM Eastern and updates daily.
- What does Groundbreak cost?
- Creating an account is free: tell Radar what you work on and it shows your matches. The names, phones and figures on every record are Pro. There is no free trial. Pro is $27 a month, every market. Cancel anytime.
- Can I ask ChatGPT or Claude for this?
- Yes, with Pro. Groundbreak runs an MCP server, so Claude, ChatGPT, Cursor and other AI assistants can search Manitoba's permits, projects and companies and say who is on them. Setup takes a minute: https://docs.groundbreak.city/mcp.