| Project | Status | Type | Units | Sq Ft | Expected |
|---|---|---|---|---|---|
| SR-886 / Port Boulevard Roadway Project State Road 886 / Port Boulevard from Biscayne Boulevard (S.R.5/U.S.1) to PortMiami, Miami-Dade County | Under Construction | Infrastructure | · | · | Aug 30, 2026 |
| MIRAI Design District 4218 Northeast Second Avenue, Miami, Florida 33137 | Under Construction | Mixed Use | · | 65,000 | Dec 30, 2028 |
| I-395 Signature Overpass / The Fountain I-395/SR-836/I-95 Midtown Interchange, Downtown Miami, FL | Under Construction | Infrastructure | · | · | Dec 30, 2029 |
| I-395 Signature Bridge (Fountain Overpass) I-395 / SR-836 / I-95 Midtown Interchange, Downtown Miami, FL | Under Construction | Infrastructure | · | · | · |
| I-395 Signature Overpass / Connecting Miami I-395/SR-836/I-95 project Downtown Miami, I-395 / SR-836 / I-95 Midtown Interchange | Under Construction | Infrastructure | · | · | · |
| I-395 Signature Overpass (The Fountain) / Connecting Miami I-395/SR-836/I-95 Midtown Interchange Downtown Miami, Florida (I-395 / SR-836 / I-95 interchange) | Under Construction | Infrastructure | · | · | Dec 30, 2029 |
| Waldorf Astoria Hotel & Residences Miami 300 Biscayne Boulevard, Miami, FL | Under Construction | Mixed Use | 387 | 1,439,352 | Jun 29, 2028 |