TUE, NOV 10Filings 7d2,153Permits 7d872Deeds & loans 7d393Starts 7d286Updates 7d1,046Building2,171Phones on file33,316
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.