TUE, NOV 10Filings 7d2,161Permits 7d880Deeds & loans 7d393Starts 7d286Updates 7d1,046Building2,171Phones on file33,316
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.