The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Electrical
Demolition of a Complete Structure Residential: Total Demolition of Single Family Home incl. Slabs & Foundations · 1 permit
Nov 18, 2025
Electrical
New Single Family Detached - Building (Residential): Build a new two story Single Family Residence · 1 permit
Apr 15, 2026
Plumbing
Plumbing permit: H&H Plumbing, under BPR-2025-02872 · Build a new two story Single Family Residence · 2 permits
Apr 15, 2026
Roofing
New Single Family Detached - Building (Residential): Build a new two story Single Family Residence · 1 permit
Apr 15, 2026
HVAC
New Single Family Detached - Building (Residential): Build a new two story Single Family Residence · 1 permit
Apr 15, 2026
Other trade
New Single Family Detached - Building (Residential): Build a new two story Single Family Residence · 1 permit