THU, NOV 19Filings 7d2,365Permits 7d819Deeds & loans 7d502Starts 7d475Updates 7d961Building5,190Phones on file33,337
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.