TUE, NOV 17Filings 7d2,376Permits 7d656Deeds & loans 7d545Starts 7d727Updates 7d951Building5,310Phones on file33,786
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually right before the first pour.