THU, NOV 12Filings 7d2,096Permits 7d726Deeds & loans 7d473Starts 7d368Updates 7d977Building2,246Phones on file33,347
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually right before the first pour.