MON, NOV 23Filings 7d1,905Permits 7d906Deeds & loans 7d280Starts 7d164Updates 7d639Building6,736Phones on file33,775
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.