TUE, NOV 17Filings 7d2,853Permits 7d800Deeds & loans 7d740Starts 7d753Updates 7d961Building5,310Phones on file33,786
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually right before the first pour.