FRI, NOV 13Filings 7d2,169Permits 7d565Deeds & loans 7d574Starts 7d551Updates 7d872Building2,316Phones on file33,367
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.