SUN, NOV 22Filings 7d2,532Permits 7d1,090Deeds & loans 7d446Starts 7d279Updates 7d912Building5,235Phones on file33,726
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.