The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Landscape
New Single Family Detached - Building (Residential): new 2-story single family residence · 1 permit
Jan 30, 2026
Plumbing
New Single Family Detached - Building (Residential): new 2-story single family residence · 2 permits
Jan 30, 2026
HVAC
New Single Family Detached - Building (Residential): new 2-story single family residence · 1 permit
Jan 30, 2026
Plumbing
New Single Family Detached - Building (Residential): new 2-story single family residence · 1 permit
Jan 30, 2026
Roofing
New Single Family Detached - Building (Residential): new 2-story single family residence · 1 permit
Jan 30, 2026
Electrical
New Single Family Detached - Building (Residential): new 2-story single family residence · 1 permit
Jan 30, 2026
Electrical
Swimming Pool/Spa/Fountain - Building (Residential): swimming pool, spa & pavered deck · 1 permit
Aug 14, 2026
Pools & water features
Swimming Pool/Spa/Fountain - Building (Residential): swimming pool, spa & pavered deck · 1 permit