The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Roofing
Addition/Interior and/or Exterior Alteration - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: Addition and interior remodel · 1 permit
Nov 5, 2026
Plumbing
Addition/Interior and/or Exterior Alteration - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: Addition and interior remodel · 1 permit
Nov 5, 2026
Electrical
Addition/Interior and/or Exterior Alteration - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: Addition and interior remodel · 1 permit
Nov 5, 2026
HVAC
Addition/Interior and/or Exterior Alteration - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: Addition and interior remodel · 1 permit