The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Landscape
New Single Family Detached - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: New two-story single family residential. · 1 permit
Oct 14, 2026
Electrical
Demolition of a Complete Structure Residential: Removal of Existing Structure, pool, onsite utilities, and vegetation. · 1 permit
May 15, 2026
Plumbing
New Single Family Detached - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: New two-story single family residential. · 1 permit
Oct 14, 2026
HVAC
New Single Family Detached - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: New two-story single family residential. · 1 permit
Oct 14, 2026
Plumbing
New Single Family Detached - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: New two-story single family residential. · 1 permit
Oct 14, 2026
Roofing
New Single Family Detached - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: New two-story single family residential. · 1 permit
Oct 14, 2026
Electrical
New Single Family Detached - Building (Residential): PRIVATE PROVIDER PLAN REVIEW AND INSPECTIONS: New two-story single family residential. · 1 permit