The subs and their phones are locked. Pro shows every one, $27 a month.
Trades on this job
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour. The trades below are the permits pulled so far, often on the sales gallery or the existing site.
Landscape
New 5 or more unit (Not Townhouse): REDEVELOPMENT OF PROPERTY WITH A NEW 9 STORY RESIDENTIAL
CONDOMINIUM OVER 2 LEVELS OF BELOW GRADE PARKING WITH AN OCCUPIED
ROOFTOP POOL AREA · 1 permit
Apr 21, 2026
Plumbing
New Standby Generator Multifamily: Installation of Generator (Value included in BPM-2025-01079) · 2 permits
Apr 21, 2026 to May 30, 2026
Roofing
New 5 or more unit (Not Townhouse): REDEVELOPMENT OF PROPERTY WITH A NEW 9 STORY RESIDENTIAL
CONDOMINIUM OVER 2 LEVELS OF BELOW GRADE PARKING WITH AN OCCUPIED
ROOFTOP POOL AREA · 1 permit
Apr 21, 2026
Electrical
New Standby Generator Multifamily: Installation of Generator (Value included in BPM-2025-01079) · 2 permits
Apr 21, 2026 to May 30, 2026
HVAC
New Standby Generator Multifamily: Installation of Generator (Value included in BPM-2025-01079) · 2 permits
Apr 21, 2026 to May 30, 2026
Fire protection & life safety
New 5 or more unit (Not Townhouse): REDEVELOPMENT OF PROPERTY WITH A NEW 9 STORY RESIDENTIAL
CONDOMINIUM OVER 2 LEVELS OF BELOW GRADE PARKING WITH AN OCCUPIED
ROOFTOP POOL AREA · 1 permit
Apr 21, 2026
Other trade
New 5 or more unit (Not Townhouse): REDEVELOPMENT OF PROPERTY WITH A NEW 9 STORY RESIDENTIAL
CONDOMINIUM OVER 2 LEVELS OF BELOW GRADE PARKING WITH AN OCCUPIED
ROOFTOP POOL AREA · 1 permit