Miami, FLSUN, OCT 18Filings 7d1,319Permits 7d558Deeds & loans 7d95Starts 7d38Updates 7d724Building1,582Phones on file26,679
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.
Residential Building Alteration: PROPOSED DETACHED ALUMINUM PANEL ROOF