FRI, NOV 20Filings 7d2,795Permits 7d1,014Deeds & loans 7d578Starts 7d519Updates 7d828Building5,207Phones on file33,480
The subs and their phones are locked. Pro shows every one, $27 a month.
Concrete Not named yet. The concrete sub shows up here when the shoring or post tension permit is pulled, usually months before the pour.